you are working as a QC in hihg rise building. when what"s
ur responsibilities works?
Answer Posted / jeyakumar
Refer Projects quality plan and do the job.If any
deviations found inform site engg/incharge and do rectify
and redo the same as per PQP.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Why reinforcement done in shorter span in two way slabs
Explain what is 1/8 on the architect ruler denotes?
whou haat goals do you have in your career
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
Explain what is structural frames or systems?
psc girder detail
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what is the difference between tsp & tower
Define What is passive earth pressure ?
Floor tile measurement? Wall to wall or skirting to skirting
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
How to cal. The weight of hollow pipe?