you are working as a QC in hihg rise building. when what"s
ur responsibilities works?

Answer Posted / jeyakumar

Refer Projects quality plan and do the job.If any
deviations found inform site engg/incharge and do rectify
and redo the same as per PQP.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?

667


Why reinforcement done in shorter span in two way slabs

1374


Explain what is 1/8 on the architect ruler denotes?

672


whou haat goals do you have in your career

1709


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

2224






Explain what is structural frames or systems?

657


psc girder detail

2716


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

1839


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12696


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2857


what is the difference between tsp & tower

1707


Define What is passive earth pressure ?

695


Floor tile measurement? Wall to wall or skirting to skirting

1372


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

1630


How to cal. The weight of hollow pipe?

725