1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answers were Sorted based on User's Feedback
Answer / sajan
One mason and helper 8 hours minimum 25 sq.m want to do.
| Is This Answer Correct ? | 16 Yes | 40 No |
Answer / sunil
One Mason with one helper 20-25 sqm plaster should be finished
| Is This Answer Correct ? | 14 Yes | 55 No |
why +1 to be followed for calculating the no of bars in BBS. Please explain
how much quantity of cement bags are required to fill the one m3 of empty container.?
how much the volume of one packet cement ?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how to cal 1:4 in brick masonary work cement and sand?
what do you mean by punching shear?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
how to compute slab reinforcements on step by step procedures??
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
what is the clear cover for shearwall?
How many solid blocks can build one mason per 8 hours?
hi... how to find reaction in continous beam 4 different span ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)