Suppose a new brick wall is being constructed,and the
courses and not aligned horizontally,what negetives can it
cause?
No Answer is Posted For this Question
Be the First to Post Answer
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
What is the difference between single reinforcement
what is the difference b/w full length and cutting length?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Management diagram of your project isβββ
1cracks found in brick wall in service building, how to rectify it,with low cost ? how to find propagation of cracks (in depthwise) and arrest on that stage? Is it require to design for Expansion joint in Brick work? if so what is the required distaces?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Difference between ton and metric ton
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
what is the weight of concrete for 1 cum?
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
WHAT IS TEAM SIZE IN CONSTRUCTION WORK
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)