1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / sunil

One Mason with one helper 20-25 sqm plaster should be finished

Is This Answer Correct ?    14 Yes 55 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1646


Minimum and maximum size of the building components

1773


what is m30 in concrete tiles

1898


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1651


What is the meaning of soil reinforcement?

668






for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1523


Define current ucs?

988


Water filter calculation formula

1341


How do you calculate load bearing capacity of a waffle slab?

2219


Why steel rods are produced only in even dimensions?

2163


What is the release of lien?

698


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

516


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5133


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1506


what is labour consume factor in residential projects

1857