1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / sunil
One Mason with one helper 20-25 sqm plaster should be finished
Is This Answer Correct ? | 14 Yes | 55 No |
Post New Answer View All Answers
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Minimum and maximum size of the building components
what is m30 in concrete tiles
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What is the meaning of soil reinforcement?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Define current ucs?
Water filter calculation formula
How do you calculate load bearing capacity of a waffle slab?
Why steel rods are produced only in even dimensions?
What is the release of lien?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
what is labour consume factor in residential projects