Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) Dear Friends, I have a 500KVA transformer supplying whole factory having 3 phase and single phase mixed loads. Power room has ammeters connected via CTs for individual phase. Now I know that readings shown on meter for each phase say R,Y and B are line currents. But when I want to know the total on transformer do I need to add the currents of all three phases readings shown on meter or value for anyone phase will give me the correct power load on transformer for that point of time. 2. If ammeter shows unbalanced readings for R,Y, B phases say 150, 250 and 300 respectively so can I assume that 150A i.e average of 3 will be the 3phase load currents and remaining will be 1phase currents. Please clarify my doubt.
4 7659Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
2 5058
What is he use of embeded systems?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
what two ways you can use to ensure that visual basic does not allow uncleared variables?
what is the meaning of vcc
Define the meaning of tristate signal in electronics?
what do you mean by non-smart instruments ? define ? give an example?
Is it able to make FMEA for Pencil creation? If yes send the FMEA
Explain the different between gate valve and globe valve?
What do we mean by partial moment release ??
How the priming can be implemented in a centrifugal pump?
WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?
Can anyone explain Things gone right(TGR) and Things gone wrong(TGW) in the APQP process? preferable With example.
What are the three tactical elements of electronic warfare?