11. What was the reason for you to quit your previous job?
Answers were Sorted based on User's Feedback
Answer / praveen gupte
Because the project is complete & they are transfering me a
long distance. so its a good time for change.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / afsar ansari
Because the project is complete & they are transfering me a
long distance. so its a good time for New callanging job
wich Growgth my future.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / sudesh
Bcoz Company Shifted there Office, But Didn't tell me ;-) ;-) ;-)
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sjtbehera
some prsonal poblem that i have to leave that job
Is This Answer Correct ? | 0 Yes | 10 No |
What is the substitute of Mastic Asphalt?
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
what is the criteria for placing reinforcement in footing and slabs e.g which span have to place first.
4 Answers Al Futtaim Carillion, NTPC,
what are the proper pipes for salt water line
How the reconcilation of the steel can be done?
3 Answers IL, JMC, JMC Projects, Simplex,
BASIC DIFFRANCE BETWEEN LIMIT STATE METHOD AND WORKING STRESS METHOD?
Brick work how many days curing and at any concreting pl
what will affect low density aggregates on concrete wt?
how many cubic centimeter in one unit of sand?
sir, i used 43grade opc cement to my wall plastering,i have cured 20 days ,recently , white dots and white powder shades are appearing on walls, is it any defect by curing excess days? have any disadvantages by it ? please answer
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted