WHAT IS YOUR EXPECTED SALARY?
No Answer is Posted For this Question
Be the First to Post Answer
what is the list of building construction equipment & teir output?
What is quantity of cement and sand required for 2000sqft of tiling?
who to calculate the bar bending schedule?
What is full form of SNF base in concrete mix design for admixture percentage?
What is the basic difference between QA and QC
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
how much cement consumption in 1 sqmt of wall cleading work (dedo)?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what is the size of 50 kg cement bag ? gunny & paper
how much steel required for 1 sq.m area?
24 Answers AA Architects, L&T,