Tell us about a time when you failed to meet a deadline.
What were
the repercussions?
Answers were Sorted based on User's Feedback
Answer / jamal
Generally speaking, if I'm going to miss a deadline, I tell
my boss before hand. He then either extends the deadline or
throws more assets at the problem to meet the deadline.
| Is This Answer Correct ? | 122 Yes | 20 No |
Answer / autumn leaves
I feel in front of a new challenge to prove my ability to
survive and compensate for lost opportunities.
| Is This Answer Correct ? | 31 Yes | 10 No |
Answer / sayeed bin awad
Feeling embaressed to disclose but it was my first job and
first assignment. I learnt a lot but then onwards i am
pretty good in meeting my deadlines..
| Is This Answer Correct ? | 59 Yes | 45 No |
Answer / afsal
that was a rare occasion that I cant meet deadline, my boss had faith on me, he gave me some extension.
| Is This Answer Correct ? | 15 Yes | 10 No |
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.14 : For a formula of y = [ 1 - 1 / (1 + r) ^ n ] / r, let y = present value, r = interest rate / year, n = number of years to future value of 1 : (a) Find a simple mathematical relationship of y as a function of r when n = 1 million years. (b) What is the present value of $10000, if the annual discount rate is 10 %, forever?
Question 63 – Autocad computer program is used to draw a pipe that is used to transport natural gases for processing. Actual length of the pipe is 10 metres. The pipe has cross sectional area of circle in shape with measured circumference of s = 3 metres. (a) If 10 units are used to represent the actual length of the pipe in computerised engineering drawing, find the diameter of the pipe, d that will be shown in the engineering drawing. (b) If one unit in the program equals to 1 centimetre, find the scale used in the computer program.
Is four stage graphite steam jet ejector is possible. Any body can provide its design
Question 62 – The names of the flow streams could be represented by : H1 for first hot stream, H2 for second hot stream, C1 for first cold stream, C2 for second cold stream. Data of supply temperature Ts in degree Celsius : 150 for H1, 170 for H2, 30 for C1, 30 for C2. Data of target temperature Tt in degree Celsius : 50 for H1, 169 for H2, 150 for C1, 40 for C2. Data of heat capacity Cp in kW / degree Celsius : 3 for H1, 360 for H2, 3 for C1, 30 for C2. (a) Find the enthalpy changes, dH for all streams of flow H1, H2, C1 and C2 in the unit of kW. Take note of the formula dH = (Cp) (Tt - Ts). (b) Match the hot streams H1 and H2 with the suitable cold streams C1 and C2 to achieve the maximum energy efficiency.
HOW WOULD YOU CALIBRATE A ROTAMETER
Define a surfactant?
I am writing the chemical engineering subject test for Reliance India Limited. Could someone who has taken the test please list some of the questions from that paper?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.18 : An investor is planning to purchase a small office for biochemical engineering consultancy on loan. In the calculation of the discount of payment in arrears, the following formula is used : y = 1 / (1 + r) ^ 1 + 1 / (1 + r) ^ 2 + 1 / (1 + r) ^ 3 + ... + 1 / (1 + r) ^ n where y = present value, r = interest rate of discount, n = number of payment, ^ = power used in certain computer languages for mathematics. (a) What is the meaning of : arrears? (b) Find a mathematical equation of y (1 + r). (c) Calculate, in less than 3 terms, y as a function of r and n.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.29 : An engineering company that produces small biochemical tools applies Installment Sales Method in its accounting. Let A = Installment Sales, B = Cost of Installment Sales, C = Gross Profit, D = Gross Profit Ratio. In year 20X8, let A = $400, B = $250, C = $150. In year 20X9, let A = $450, B = $315, C = $135. If the value of D = 37.5 % in year 20X8 : (a) find the value of D for year 20X9; (b) calculate the realized gross profit = ED / 100, for year 20X8 when the cash collected from sales is E = $100.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.8 : Cash flow agreement where the sign + or - of the amounts are start negative and at a point switch to positive and stay positive is referred to has an investment. The cash flow could be denoted by the symbol of [a, b, c ...]. Consider the following two cases in a biochemical factory : (a) You pay $1 today. You receive $1.05, one year from now. (b) You pay $3 today. You receive $5, one year from today. You pay $2, two years from today. Determine if cases (a) and (b) are an investment or a business transaction with cash flow symbol. Find the interest rate r in the cash flow in both cases (a) and (b).
Name some guidelines for designing for liquid and gas velocities in process plant piping?
Why are decomposition reactions called the opposite of combination reactions?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)