which types of tests are required after commissioning of
6.6 kva tranformer?
Answer Posted / m k
after commissioning breakdown voltage test of oil and dissolve gas analysis of oil should be performed periodically.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the meaning of Insulation H for transformers????
what is the differebt between ac and dc fuse?
How to decide cable tray size?
how to calculate kvar in Akiva
concept of busbar and load dispatching..?
what is the voltage rating of chiller unit sensors
I have a CT meter with ratio 60/5. The meter reading of previous month was 3290.49 and that of current month was 3797.26. How many chargeable units as per normal meter should be my reading.
What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?
How to calculate the efficiency of Turbo Generator(Alternator) in general....?
State superposition theorem?
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
We have Diesel generator of 200KW. fuel consumption is always same,even connected light load or full load. Is it right?
what is meant by LCR meter? where its useful ?
what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker
10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)