Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


when the PFR (POWER FACTOR REGULATOR)change a step to
zero,one of the RCCB will triped off,is it the changing step
of this PFR effect the RCCB?

Answers were Sorted based on User's Feedback



when the PFR (POWER FACTOR REGULATOR)change a step to zero,one of the RCCB will triped off,is it th..

Answer / pillay

what is a RCCB doing inside a PFR. Any way if a rccb trips
than it means there is a earth leakage.otherwise the wiring at
the PFR is wrong especially the neutral connections or the
RCCB itself is faulty. Check all the wirings first and than
try substituting the RCCB itself

Is This Answer Correct ?    0 Yes 0 No

when the PFR (POWER FACTOR REGULATOR)change a step to zero,one of the RCCB will triped off,is it th..

Answer / pillay

what is a RCCB doing inside a PFR. Any way if a rccb trips
than it means there is a earth leakage.otherwise the wiring at
the PFR is wrong especially the neutral connections or the
RCCB itself is faulty. Check all the wirings first and than
try substituting the RCCB itself

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why we use series reactor in power system?

9 Answers   Cadbury, HEG, Uttam,


How work of capacitor in dc supply...???

0 Answers  


what happens if we give 1-ph supply for 3-ph Bridge rectifier...??

2 Answers   Sanelec,


Latching current is slightly less than ?

2 Answers  


An 11kv system consisting of an underground cable to a sub station about 300 meters away was shut down for about 10 hrs. On energising, it tripped off on earth fault about 10---20 mins later 6 times but since than it is not tripping.its already 3 weeks now. The SPAJ was found to be fine. what could be the cause.No test had been done to determine the cause of the trippings till now because of demand.

2 Answers  


What is the permissible value of earth resistance and as per which standard / act / rule ?

3 Answers   HBL Power Systems,


How to calculate multiplication factor in kva example 500kva ans pls ?

0 Answers  


can u give me a brief idea about power line carrier communication ??

0 Answers  


what are the advantages by using IGBT in VSC HVDC than thyristor in conventional HVDC

1 Answers   Bhel, Eskom,


what is the voltage equation of 240/12 v transformer??

1 Answers  


What is VCB? Where it is installed?

11 Answers   Hyundai,


What is thef ormula to calculate the rating of a capacitor for a single phase motor

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)