Answer / rishit
Sorry to say but KW-HR is not a unit of electricity
it is the unit by which electricity department charges our
bill the reason after that is if we put a load of 1 kw on
meter then it takes one hour to change its one reading after
one hour
remember i am asking to put only load of one KW not more
than that and after one hour only 1 KW reading will increase
that is why it is KW per Hour
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / rajesh
If you want to represent bulk power, you can use a bigger
unit like Megawatt hour or Gegawatt hour. (1 MWH = 1000
KWH; 1 GWH = 1000MWH).
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / anil bhatia
the energy meter which measure unit is desine to calculate
kwh . ie 1000 X wattes x Hrs (time consumed or used the
power).
where watts is volts X current .
voltage= is applied/given volts,
current=Amper taken by load
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / thuranga
Rishit's answer is also correct,
and also the another one is load is not constant for a
minute in our normal life i.e if we measure power at
12noon,that load will not be same at 12:30 pm.
So on an average the load is calculated on hourly basis for
the purpose of finding the efficiency for all day.,and also
the power consumed domestically.
| Is This Answer Correct ? | 3 Yes | 4 No |
what is field flash
what is the difference between circular wdg & ractangular wdg?
why surge protectetor work explain with the help of circut diagram?
in transformer the unit of power is in kva why?
two generator runnig with parallel but only one NGR on And one off Why
can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?
advantage of cu cable over al cable
What is stub protection is all about?
How grounding is different than earthings?
What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?
Based on what the rating of machines are provided??(ANswer should in single word)
19 Answers Asian Paints, Bhel,
why transformers are put with supply for 24 hours before giving supplying to a locality?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)