can anybody send the rrb chennai &rrb bopal question papers
of 2006&2007.My exam is on 12 oct 2008.Its urgent
No Answer is Posted For this Question
Be the First to Post Answer
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend
why we r used DC megger insted of AC megger?
how to build a network which step down 415v to 1v rms
How to calculate meter constant in HT yard pls give me example for this issue
1 Answers Juniper Networks, MacLellan,
when the flux enters into saturation mode then what will be the secondary voltage of the normal t/f?....high or low ? explain ...how?
what is transient earth voltage
Which colour of earthing wire
what are clipper and clamper circuits?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
what should be the no load current of an induction motor
whose motors self starting synchronous or Induction motor?give fact reason why not self starting another mother
pls tell us AC plant are how do work and parts name with picture
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)