plz send me hpcl and reliance entrance test papers on my id
s,kumar_bk@yahoo.co.in
Answer / shubhangi bhargava
even i m looking for the answer to the same question.pls
lemme knw if u get 2 know anything about it.
| Is This Answer Correct ? | 1 Yes | 0 No |
what is the difference between psv and prv?
what is the purpose of knockout drum in SRU?
Question 55 - The differential equation is 3 dy / dt + 2y = 1 with y(0) = 1. (a) The Laplace transformation, L for given terms are : L (dy / dt) = sY(s) - y(0), L(y) = Y(s), L(1) = 1 / s. Use such transformation to find Y(s). (b) The initial value theorem states that : When t approaches 0 for a function of y(t), it is equal to a function of sY(s) when s approaches infinity. Use the initial value theorem as a check to the answer found in part (a).
POLYMER ENGINEERING - QUESTION 24.1 : The molecular weights M in kg / mol of 3 different monomers a, b and c in a polymer are Ma = 14, Mb = 16 and Mc = 18. The fraction of polymer chain X of 3 different monomers a, b and c in a polymer are Xa = 0.5, Xb = 0.3 and Xc = 0.2. (i) Calculate number average molecular weight by using the formula Ma Xa + Mb Xb + Mc Xc. (ii) Calculate weight average molecular weight by using the formula (Ma Xa Ma + Mb Xb Mb + Mc Xc Mc) / (Ma Xa + Mb Xb + Mc Xc). (iii) Calculate the polydispersity by using the answer in (ii) divided by answer in (i). (iv) If the molecular weight of repeat unit is 12, calculate the degree of polymerization by using the formula (Ma Xa + Mb Xb + Mc Xc) / (molecular weight of repeat unit).
how can I find out a sulfuric acid recovery plant disigner?
Why should chemical equation be balanced?
What happens when fuel is burned , what are compounds released??
What is a good way to get started in doing a plant-wide steam consumption analysis?
How can you estimate the efficiency of a pump?
What are some common problems associated with dilute phase pneumatic conveying?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.18 : An investor is planning to purchase a small office for biochemical engineering consultancy on loan. In the calculation of the discount of payment in arrears, the following formula is used : y = 1 / (1 + r) ^ 1 + 1 / (1 + r) ^ 2 + 1 / (1 + r) ^ 3 + ... + 1 / (1 + r) ^ n where y = present value, r = interest rate of discount, n = number of payment, ^ = power used in certain computer languages for mathematics. (a) What is the meaning of : arrears? (b) Find a mathematical equation of y (1 + r). (c) Calculate, in less than 3 terms, y as a function of r and n.
What is the maximum permissible Earth to Neutral voltage in an electrical system.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)