WHAT IS ENTRY CRITERIA AND EXIT CRITERIA
Answers were Sorted based on User's Feedback
Answer / sathyanarayanan
Entry Criteria
Test Case completed
Resource are Identify
Test Data is available
Test Environment Setup
Exit Criteria
All Test Cases Executed
2. All Defects report and Retested
3. Test documents are updated with results
4. All reports are generated:
* Execution report
* Defect Report
Is This Answer Correct ? | 16 Yes | 0 No |
Answer / mukund
hi can some body make me little bit more clear abt the
entry and exit criteria.
1. Entry criteia means when we are going to start the
testing . , then what are the necessary steps we have to
take.
2.exit criteia To which point we are calling as exit
criteia , wheather we sucessfully completed the testing ,
like as mentioned in answer 1 or due to some irrecoverable
error we stopped the testing like as answered in 2 .
3. can we a write both the conditions in exit criteria
Is This Answer Correct ? | 5 Yes | 3 No |
Answer / ashfaq ali khan
Very correctly Said Sathyanarayan
Adding my 2 cents to his answer
But here in xit Criteria , we have to consider " When to
stop Testing "
Testers gain confidence in the functional specification of
the Application or System
Risk of the System needs to be taken care when we decide to
stop testing
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / piya
entry criteria:set of conditions for permitting a process to move forward wid defined task
exit criteria:set of conditions for permitting a process to be officially completed
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / mns
Entry criteria: what are the preconditions to the tests.
1) Are test cases ready?
2)Is the test environment ready?
3)Are the client rquirement documents ready?
Exit Criteria:
1) Are all the critical errors and bugs been addressed and
removed.
2)Is our Test matrix( i.e are all the requirements are
addresed in the application)ready?
3)Do we still have the time for the completion of the
project?
4) Whats the status of the budget of the project?
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sudhakar8
ENTRY CRITERIA:
Testing is done in rounds. Software passes though several
rounds before it gets released.
EXIT CRITERIA:
Testing is stopped when there are many major bugs and
critical system errors, when further testing is not
feasible
Testing is stopped when the system becomes un stable during
test.
When those critical errors are fixed and system is stable,
the next round of testing is started .
The test cases are executed all over again in each round.
Is This Answer Correct ? | 4 Yes | 7 No |
QA Responsibilities?
If conflict arrises between u and developer how will solve that?
What do you think is the perfect test management system for test service vendors like me?
what is the difference between lifecycle model and v-model
Hi, Please can anyone tell me the difference between writing test cases & test scenarios? What all should be included while writing a test scenario?
What is Bidirectional Traceability and how it is achieved?
I. Policymaker II. Technical specialist III. Project manager IV. Software development manager The personnel listed above represent a partial list of candidates for the configuration control board (CCB). In addition to software QA and software CM, which of these personnel should be included on the CCB? 1. II and IV 2. II 3. II and III 4. I and II 5. I, II, III, and IV
is possible smart identification through descriptive Programing
can you explain the software testing life cycle?
What is the QA process?
Three types of tea the a,b,c costs Rs. 95/kg,100/kg and70/kg respectively.How many kgs of each should be blended to produce 100 kg of mixture worth Rs.90/kg, given that the raveled s of band c are equal...
2 Answers CTS, John Deere, TCS,
What are the day to day activities involved in QA process ?