WHAT IS ENTRY CRITERIA AND EXIT CRITERIA
Answers were Sorted based on User's Feedback
Answer / sathyanarayanan
Entry Criteria
Test Case completed
Resource are Identify
Test Data is available
Test Environment Setup
Exit Criteria
All Test Cases Executed
2. All Defects report and Retested
3. Test documents are updated with results
4. All reports are generated:
* Execution report
* Defect Report
| Is This Answer Correct ? | 16 Yes | 0 No |
Answer / mukund
hi can some body make me little bit more clear abt the
entry and exit criteria.
1. Entry criteia means when we are going to start the
testing . , then what are the necessary steps we have to
take.
2.exit criteia To which point we are calling as exit
criteia , wheather we sucessfully completed the testing ,
like as mentioned in answer 1 or due to some irrecoverable
error we stopped the testing like as answered in 2 .
3. can we a write both the conditions in exit criteria
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / ashfaq ali khan
Very correctly Said Sathyanarayan
Adding my 2 cents to his answer
But here in xit Criteria , we have to consider " When to
stop Testing "
Testers gain confidence in the functional specification of
the Application or System
Risk of the System needs to be taken care when we decide to
stop testing
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / piya
entry criteria:set of conditions for permitting a process to move forward wid defined task
exit criteria:set of conditions for permitting a process to be officially completed
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / mns
Entry criteria: what are the preconditions to the tests.
1) Are test cases ready?
2)Is the test environment ready?
3)Are the client rquirement documents ready?
Exit Criteria:
1) Are all the critical errors and bugs been addressed and
removed.
2)Is our Test matrix( i.e are all the requirements are
addresed in the application)ready?
3)Do we still have the time for the completion of the
project?
4) Whats the status of the budget of the project?
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sudhakar8
ENTRY CRITERIA:
Testing is done in rounds. Software passes though several
rounds before it gets released.
EXIT CRITERIA:
Testing is stopped when there are many major bugs and
critical system errors, when further testing is not
feasible
Testing is stopped when the system becomes un stable during
test.
When those critical errors are fixed and system is stable,
the next round of testing is started .
The test cases are executed all over again in each round.
| Is This Answer Correct ? | 4 Yes | 7 No |
Looking for a test management system I work for a small company (we are a group of five software engineers) into software testing and we are looking out for a test management software which has in-built live reporting and centralized repository systems.
What is the role of Tester in BRS(Business Requirement Specification)phase in V-Model.
what is the diff between smoke testing & monkey testing?
how can we explain for "what is STLC(software test life cycle)
where can i find latest software quality interviews questions
what is scalability testing?
what all we should write to prepare a test report?plz wit template?
What is a test plan and what does it include?
What type of tests you perform on the web based application?
defect, error, failure, fault
4 Answers Infosys, Quinnox, Redlix,
Please suggest a Automation Tool that helps in collaborating with teams located in various geographic locations
what is CAPA?when is root cause analysis done?
1 Answers Ariel, Knorr-Bremse, NIIT,