WHAT IS ENTRY CRITERIA AND EXIT CRITERIA
Answers were Sorted based on User's Feedback
Answer / sathyanarayanan
Entry Criteria
Test Case completed
Resource are Identify
Test Data is available
Test Environment Setup
Exit Criteria
All Test Cases Executed
2. All Defects report and Retested
3. Test documents are updated with results
4. All reports are generated:
* Execution report
* Defect Report
| Is This Answer Correct ? | 16 Yes | 0 No |
Answer / mukund
hi can some body make me little bit more clear abt the
entry and exit criteria.
1. Entry criteia means when we are going to start the
testing . , then what are the necessary steps we have to
take.
2.exit criteia To which point we are calling as exit
criteia , wheather we sucessfully completed the testing ,
like as mentioned in answer 1 or due to some irrecoverable
error we stopped the testing like as answered in 2 .
3. can we a write both the conditions in exit criteria
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / ashfaq ali khan
Very correctly Said Sathyanarayan
Adding my 2 cents to his answer
But here in xit Criteria , we have to consider " When to
stop Testing "
Testers gain confidence in the functional specification of
the Application or System
Risk of the System needs to be taken care when we decide to
stop testing
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / piya
entry criteria:set of conditions for permitting a process to move forward wid defined task
exit criteria:set of conditions for permitting a process to be officially completed
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / mns
Entry criteria: what are the preconditions to the tests.
1) Are test cases ready?
2)Is the test environment ready?
3)Are the client rquirement documents ready?
Exit Criteria:
1) Are all the critical errors and bugs been addressed and
removed.
2)Is our Test matrix( i.e are all the requirements are
addresed in the application)ready?
3)Do we still have the time for the completion of the
project?
4) Whats the status of the budget of the project?
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sudhakar8
ENTRY CRITERIA:
Testing is done in rounds. Software passes though several
rounds before it gets released.
EXIT CRITERIA:
Testing is stopped when there are many major bugs and
critical system errors, when further testing is not
feasible
Testing is stopped when the system becomes un stable during
test.
When those critical errors are fixed and system is stable,
the next round of testing is started .
The test cases are executed all over again in each round.
| Is This Answer Correct ? | 4 Yes | 7 No |
can bug lifecycle support the integration , system, unit testing, functional testing etc
I want to create a set of portofolio for increasing the chance applying as a SQA Tester, the Question is, What kind of thing that must I put on that Portofolio?
What is Operational testing?
What are the automation challenges that sqa(software quality assurance) team faces while testing?
what is software quality assurance?
What is the difference between Bug and Issue?
hi friends, i plan to study istqb certification cource. so any one send me model question paper for me.
What is the differnt between Test condition and TesT Scenario
What is Database Testing? How will you do it?
Explain what should your qa documents include?
i completed btech in IT in 2012.i am not good at programming.i want to do software testing.am i eligible for the course and how will be my future?please help and than you
What has not worked well in your previous QA experience and what would you change?