Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Write down the classification of the transmission line?



Write down the classification of the transmission line?..

Answer / hanumeshpatil

Overhead Transmission Lines
Sub transmission Lines.
Underground transmission lines.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Operation carried out in thermal power stations?

0 Answers  


what is effect of reverse c.t connection on metering.

4 Answers   Cushman Wakefield,


How earthing/grounding done in aeroplanes and ships.

0 Answers  


Two CTs 1600/1 and 35/1 are in series. while checking the ratio test of a CT(1600/1),same 1600A will also pass through the CT having ratio 35/1. Will it be harmfull to the ct(35/1),if yes , what will happen.CT secondary is shorted

3 Answers  


Differentiate between Zero and Negative sequence current

0 Answers  


What is the difference between the impedance percent and impedance voltage ?

0 Answers  


how to calculate size of cable from motor current given and how to calculate full load current of a induction motor.

3 Answers   Aarti Steels,


I am working as a software engineer for the past 4 years. I am interested to do M.tech in premier inst. like IIT, IIIT, NIT,... I am preparing for the GATE exam for the past 2 years. Can anyone tell me how about the placement in IIT's for m.tech in (microelectronics and vlsi or electronics related discipline). Some of them are telling like placement is very rare for m.tech electronics. Also the placement details in IIT websites are not true. Is that so ? can any one help us regarding this.

1 Answers  


Is there any local or International standards that prohibit the installation of earthing pit in the planters area where the earthing pit is subject to continues soak in water?

1 Answers  


in transformers for ex. 100mva and 400kv the secondary current is about 420 amps but for selection of bushing the capacity of selected bushing is 2000A why there is such big difference ?

2 Answers   ABB,


Explain the Term in CT Name Plate – Class: 5Ps

3 Answers   Divis Laboratories,


checklist of ELCB

1 Answers   EECE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)