What is meant by rotor?
No Answer is Posted For this Question
Be the First to Post Answer
can anibody tel me on what basis the transformer vector groups are determined????
Interchange 7 and 6 ,÷and× 36×7+4-7×3
there is an alternator 480 k.w, 400v,50hz, 4-wire running on load having leakage alternator body earthed current 38 A. is it within acceptable limit? if yes then give reference if no then how to bring within specified limit
What does bode plots shows?
What is warm / cold start of HT motors. How many warm start & cold start are possible in a day?
during installation time of transformer and alternator which points we have to observed?
i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh
Whats changes in Transformer Oil BDV in changes in temp or Climate?
what is earthed and inearthed cable or system?
how does a tube light starter works?
how to determine ct ratio in ht vcb?
at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)
0 Answers Ebrahim Textile, Siemens,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)