Tell me any other tools for scheduling purpose other than workflow manager pmcmd?
Answer / Yogesh Kumar Gautam
Other tools for scheduling purposes in Informatica include PowerCenter Scheduler, Control Center, and Data Integration Service (DIS).
| Is This Answer Correct ? | 0 Yes | 0 No |
Differences between version 7.x and 8.x.
1 Answers Accenture, Cognizant,
how the server recognises , if the session fails after loading the 100 records in to the target
i have a data in my source as a flat files what test i have to perform the next step can any body help to me
what are the fact table & dimensional table in pharmaceutical and hospotal related products???
What is the difference between Junk and Confirmed Dimention? where can be used htat one in Informatica?
What is ThroughPut in Informatica, How it works, Where I can find this option to check ?
What are the different lookup cache(s)?
what is the location of parameter file in informatica?
Can we insert ,update ,delete in target tables with one update strategy tran.?
Briefly describe lookup transformation?
3,if our source containing 1 terabyte data so while loading data into target what are the thing we keep in mind?
Can anyone guide me the steps to install informatica PC 8.5.1 with database as oracle