Are there any general rules that should be considered when designing a slurry piping system?
No Answer is Posted For this Question
Be the First to Post Answer
hi im appering for the written test of vizag steel plant for MT-2009.plz send me the pattern of placement paper plzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz
Tell us about a time when you failed to meet a deadline. What were the repercussions?
4 Answers Bhavani Engineering Works, Caltex, Emirates, Holiday Inn, Regent, United States Seafoods,
What is screen analysis?
how to find a liquid flow's direction in a closed pipe by merely seeing it(without pressure gauges)...
A cylinder having water is being evacuated with constant rate. what is the relation between pressure which is existing in cylinder with time? (P and t relation)
How can you prevent bridging in a dilute phase pneumatic conveying system?
Question 109 - (a) Acceptable wavefunction in quantum mechanics in the range of : negative infinity < x < positive infinity, vanishes at least at one boundary. Which of the following is the wavefunction or are the wavefunctions of acceptable theory : P = x, P = | x |, P = sin x, P = exp (-x), P = exp (-| x |)? State the reason. (b) Let linear momentum operator P = -ih d / dz. The wavefunction is S = exp (-ikz) where i x i = -1, k and h are constants. Find the linear momentum of such wavefunction by using the term P x S.
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
What is vapour flooding and liquid floodin in distillation?
What are some factors to consider when trying choosing between a dry screw compressor and an oil-flooded screw compressor?
i am going to appear vedanta written test so plz can any body suggest me for this on madhu.5393@gmail.com
how interstage pressure of multistage compressor is calculated?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)