Answer Posted / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
what is right & short method of measurement of slab&beam
3. What are the disadvantages of your present job, things you do not like about it?
how to identify np3 pipe and np4 pipe
what is the permanent solution applied for restoration of leaning tower of pisa?
what is diversion?
What is difference between combin footing & rapt footing
How will you Engage Labours on Site?
PL.tell me about civil engineering questions with answer
What is different between DI Pipe and CI pipe?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)