apart from bug reporting wat is ur involvement in project
life cycle
Answers were Sorted based on User's Feedback
Answer / aman
Apart from bug reporting Test Engineer's involvement in
projectlife cycle are:
1.design test cases
2.prepare testcases
3.Execute Testcases
4.track the bugs
5.Analysis the results report the bugs
6.Invovled in regression testing
7.Performance of system testing
8.system intergration testing
9.preparation of Test summary Report
10.Involve in Quality sigh off for UAT
11.Training the business user on the new configuration
12.Taking their(users)feedback back to the developer.
Aman Kumar
aman.testing@gmail.com
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / dave
in addition to the above mentioned,preparation of
traceability matrix too...
| Is This Answer Correct ? | 3 Yes | 0 No |
As a Test engineer We design test cases,prepare testcases
Execute Testcases, track the bugs, analyse the results
report the bugs.
invovled in regression testing, performance of system
testing system intergration testing
At last preparation of Test summary Report
| Is This Answer Correct ? | 2 Yes | 1 No |
Difference Between Quality Center and Test Director?
How to test the Fire walls?
how will define a bug generally?
1. what exactly is heuristic checklist approach for unit testing ?
diff between water fall model and v-model?
can any one tell me wat is dependent and independent scripting?
Hi, what do you mean by internal auditing? what are the things they do in internal auditing?what they review? THNX in Advance
When to do Black box testing?
What’s the role of documentation in manual testing?
Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks
what is build? what is build coniguration?
Project had been started in Manual testing and Automation of some fixed modules, Then finally decided to Test the total Application in Automation then it is possible to test that application.