apart from bug reporting wat is ur involvement in project
life cycle
Answer Posted / aman
Apart from bug reporting Test Engineer's involvement in
projectlife cycle are:
1.design test cases
2.prepare testcases
3.Execute Testcases
4.track the bugs
5.Analysis the results report the bugs
6.Invovled in regression testing
7.Performance of system testing
8.system intergration testing
9.preparation of Test summary Report
10.Involve in Quality sigh off for UAT
11.Training the business user on the new configuration
12.Taking their(users)feedback back to the developer.
Aman Kumar
aman.testing@gmail.com
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Are there more defects in the design phase or in the coding phase?
For any web application, what are the possible login features that should be tested?
What are cookies?
What is Stability and Performance Testing in Testing the TV
How can I done a Web Testing? Which steps are include in it?
can u plz give an example for regression testing with example.
what is the difference between Risk based and Requirement based testing???
Hi.....wat r d major bugs we can find in banking domain???
Hi to all, im vaibhav i joined a MNC as a tester and i got a banking (HSBC) project can any one tell me as a fresher what kind of strategy i sholud use to perform better. thanx
how will we change the server system time?
What are the types of maintenance?
what is mean by impact analysis ,how we used to select regression TC using this?
Could anyone share FAQs for Test Manager position...
A form has four mandatory fields to be entered before you submit. How many numbers of test cases are required to verify this? And what are they?
what is your daily activities?