how to calculate of m20 c.c road work 1cu.m
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
Bernaullis theorem deals with the law of conservation of mass momentum energy none
What Should be the CBR Value for Transported (Selected) Soil.whether it can be 5% or not ?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
0 Answers National Construction Authority,
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
Where are u provide laps in columns & beams?
what is the percentage of binding wire required for 1 mt of steel binding in gerally
What is the cost difference between site mix and ready mix concrete per cubic meter
how we can design the design mix(m25)
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
What does 'M' stands for in M24 bolt ?
how to do reconciliation of steel
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)