can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
Answer / Umesh Kumar Morya
Calculating the concrete quantity for an under-reamed pile requires knowing the specific formula, which can be complex and depends on the exact shape of the pile. However, I will provide you with a basic calculation for a cylindrical pile:
For a cylindrical pile with a diameter 'd' and height 'h':
Volume = π * (d/2)^2 * h
In your case:
r = diameter / 2 = 300mm / 2 = 150mm
So, d = 300mm, which gives us a volume of approximately 6.4 cubic meters.
| Is This Answer Correct ? | 0 Yes | 0 No |
Need of oxygen dosing in super critical powerplants?
How We Calibrate the vaccum transmitter?
.What do you mean by Turbine Dump.
what is actual CAL MODE & cal means?
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Why cold water is used for Boiler Hydro test
What is wheel chamber in steam turbine?is it impulse blades are called wheel chamber in the steam turbine?
During shutdown of Steam Turbine,How do we cross the critical speed?
.What is drip and drain.
which safety valve will open first if steam is not been supplied to turbine.
voltage and frequency is equal but synchronisation not complete why?
how many safeties should be present in boiler?what are they?
4 Answers DN, Nandi, Pump Technology, Siris, Thermax,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)