How much steel required for 1 sq. meter area?
Answer / khan.altaf786@gmail.com
how can be possible that 1 sq mtr slab area required 25 to 30 kg steel
in simple term residential building in slab having a thickness
110 to 125 mm provided Reinforcement generally #8@150 c/c for
distributer bar & #8@200 c/c spacing then calculation says that 5.530+1.825 => 7.355 Kg Per Sq mtr in slab
i also consider this figure may variously According to structure type
Is This Answer Correct ? | 5 Yes | 0 No |
where cross hairs in surveying telescope are fitted
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
0 Answers Bhugan Infracon, UltraTech,
the shearing strength of cohesionless soil depends on
What is the best mixing ratio of concrete materiloas for raft foundation?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
how to calculate sump capacity
2 Answers AVS, KMC, Personal Assistant, Shrey Associates,
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
What is all weather canal
Is there any codal provision stating the actual diameter for chair bars?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
what are the CAD software versions you have used?
12 Answers ERA, IES,
08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1 is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =