What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
Answer / nadim shaikh
6% to 10%
also depends upon stacking of materials
| Is This Answer Correct ? | 1 Yes | 2 No |
what is meant by civil engineer?
How to take labor charges for construction of 1cum of concrete?
m25 water cement ratio calculation
What is the best concrete grade for raft foundation up to 1.5 meters depth?
How do you calculate reinforcement weight of steel?
NP3 CLASS HUME RCC PIPE
define silt?
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
what is the m25 test result 7 days 14 days
what is density on steel bars?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)