Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we don't use earthing as neutral?



why we don't use earthing as neutral?..

Answer / sharan

if we used earthing as a neutral earthing cable will connected with all equipements if any where cut the earthing cable we will get the return supply we will get a electric shock so we can't use the earthing as aneutral.

Is This Answer Correct ?    14 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?

0 Answers   OPS,


3ph motor running with unequal kw and different pf what are the reasons

0 Answers   UltraTech,


how many frequent start/stop operation possible in case of HT MOTORS.

5 Answers   DVC, Steel Plant,


What is voltage ratio of a transformer?

0 Answers  


What are types of central ac plants?

1 Answers   HSL,


AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO THE GENERATOR WHICH ACTS AS MOTOR. WHAT IS THE NEED OF RUNNING THE GENERATOR AS MOTOR?

6 Answers  


I want to apply for ONGC recruitment 2012 .I am BE Electrical but it is mentioned that to apply for this post you have to have Electrical supervisor certificate .so please tell me from where can i get such certificate ???

1 Answers  


1))why we run three phase or three different circuit from a single conduit 2)) why not two circuit of different phase run in same conduit?? and why we run same three cicuit of same phae run in single conduit??

0 Answers   ACC,


What is Earth Fault and Over current Fault.

1 Answers  


We have 11kV/110V three phase indoor potential transformer in 66/11kV Sub-station, where the failure of PT is frequently happening and the rating of the PT is 0.2 class accuracy, with primary star and seconday (two cores) star connected. Some experts has suggested to not to connect the PT Primary neutral to the ground because when transformer neutal NCT connection is loose; the faulty current will flow through the PT primary neutral, resulting into failure of PT. My question is: Is it necessary to remove the primary neutral connection of the PT from ground? if not, what would be the reason for failure of PT. Please guide me.

2 Answers   KPTCL,


Approach of a cooling tower is the difference between temperatures of what factors?

0 Answers   Blue Star,


What is Class and accuracy in CTs? Types of Classes and important of Classes?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)