Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to find water-cement ratio perfectly proportions M20, M25, M30

Answer Posted / anand samy

Water cement ratio = weight of cement x 0.45 or 0.5 (ratio)

for example if u take 50kg cement, the water volume is


50 x 0.45 = 22.5 water is needed for concrete..

also add some percent for wastage....

Is This Answer Correct ?    9 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the basic use of runners and standards of pipelines?

1213


on what basis the partial factor of safety are decided? form the load combinations

2239


what is the meaning of 40/20 src

6255


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1952


How to find beam R/F cutting length

1769


What black man invented the clothes dryer?

1082


What happens to Load at yielding ?

1397


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

5080


Moisture content calculation for diff mix ratio's ??

1747


What are the ingredients of pre-stressed concrete?

1211


Explain different types of rcc pipes.

1144


What are the responsibilities of a site manager?

1117


pile load testing procedure

2204


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

2198


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

2076