Answer / sagar boda
shear wall resist horizontal loads from developed by earthquake and column resist compression load(vertical load).
| Is This Answer Correct ? | 22 Yes | 0 No |
Answer / teja
column is a vertical compression memeber, in which compression force is acting axially...
shear walls are the walls constructed to resist shear
eg: walls surrounding the lift's .
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / abhinaw patnaik
shear wall is wall which is help the slab to rasist the shear.
and column is a vertical member of a building which transmit the load to the footing.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / aman kumar
Shear wall is a concreat wall.
while,
column is a sqr or circular member
| Is This Answer Correct ? | 4 Yes | 13 No |
cavitations is caused by
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
How is the strength of cement measured?
What is the PH value for domestic water supply
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
how much cft in 1 bag cement.
9 Answers Pinto Construction, Synergy,
8. What do you find more useful in your present work – your education or your practical experience from previous jobs or traineeships?
what is lap length? why it is required?
what is mean by quality in terms of construction
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)