when the Transmission and Distribution network where is the "feeder" lines are located? and why should be used in T&D network.....
No Answer is Posted For this Question
Be the First to Post Answer
What is difference between metal clad & metal enclosed switchgear?
what is basic difference between the normal tube light choke and electionic choke ?
my question is how to answer the question "you are from b.tech eee background and why do you want to go for banking
Why don't connect earth wire to elcb?if earth fault occur,how will detect it
1 Answers TATA, Tata Communications, Telecommunications,
i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result
Three phase alternators are connected in star connection why?
How can we measure the residual voltage in dc machines?
In transmission line 11kv,33kv etc are rms values are peak or others??
my diploma certificate in my higher education college
HOW DO I CALCULATE THE SETTINGS FOR THE DIFFERENTIAL PROTECTION OF A 12kV/6.6kV, 6MVA,DYN11 XMER WITH PRIMARY SIDE CTR 400/1 AND SEC SIDE CTR 600/1?
We say that if voltage in a power system is increased,for a constant power the current will decrease (by P=VI). isn't this in disagreement with the ohms law(I propotional V;resistant const.).Since the resistance of transmission lines remains constant,shouldn't inc in voltage cause inc in current across the transmission line? I have read many articles across the net but still couldn't this figure this out. :( Guyz plz assist me with dis..:)..
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)