Answer / penumatsa manikumar
First we have to check load cell resistance , voltage and sensor + Excitation - Excitation ,+ Signal - Signal, + sensor -sensor. we should check all connections at PSB board and terminal outputs. for example some load cells getting resit is 485 +or- 10 and some load getting 845 +or- 10. So voltage also 5v or 24v. note resistance consistent. If not getting in +or- below resistance that load cell OK.above getting that to be check . Then put weight and check calibration zero or span as per requirement.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / bhavesh jaiswal
Firstly we connect Load Cell to Load cell Display.
Check on NO Load Reading.
Then Check a Known weight on it.
If value is same then no need of calibration.
If different then Change setting Feed known load value on it
| Is This Answer Correct ? | 0 Yes | 0 No |
plz send me l&t auestion papers. i have been called for written and interview industrial automation 2 yrs exper. send me on mail pal_deepak06@yahoo.com
i want piping routing interview questions ?
3 Answers Lesus, ONGC, Penta Global, Technip,
can you give me the solution of iiie
Dear friends, I got admit in one of the u.s university.I didnt take TOEFL and the university which i had applied have accepted IELTS instead of TOEFL.But i am worried whether the u.s visa interviewers will accept IELTS.please tell me your views about this problem and also suggest how to answer this question.If anyone had faced the same problem please E-mail and share your experience to me.I would be gratefull if you do me this help. Thankyou
What you know about ISO 9001? What is quality management system? Weather QMS is suitable,adequate and effective or not? Is there any Quality Policy? Is there any Quality Objectieve? If yes, then what are they. How they are planning to achieve Quality objectives? Weather they are measuring quality objectives?
What you know about iso 9001? What is quality management system? Weather qms is suitable, adequate and effective or not? Is there any quality policy? Is there any quality objective? If yes, then what are they? How they are planning to achieve quality objectives? Do they are measure quality objectives?
Why we use pneumatic instrument.
What points should be kept in mind to build an effective organization?
What is vendor developement? what is the logistics transport control?
What is centre height in cnc lathe
0 Answers ABTS, Maruti Suzuki,
How we install and terminate the wire of pressure transmitter and temprature transmitter. Give full explanation.
Define operation time?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)