how to find the electricity cost per m3 in ready mix concert plant?
Answer / fred
Let us say:
Electricity unit=kwh
Cost = USD/m3
Assuming:
Your Mixing Concrete Plant can produce 100m3 in 1hrs and the consumption electricity is 10 kwh, the cost per kwh is 10 USD.
Therefore:
100 m3/hr = 100 USD
| Is This Answer Correct ? | 0 Yes | 1 No |
what is Automated smoke test suit? and why we use thah in QTP??
Difference between chopper and dbr?
what is ts
what does EN230 material mean?
why SCR cannoy be used as a bidirectional device
different regulator ICs
what is impeller front clearance of pump ?
axial displacements of the turbine. What could be the causes?♪ ♪
How important are statistics in industrial engineering?
what is load capacity of 11 cm cylinder bor 100kg. pressor?
what are the different ripple removing circuit . which one is better and why
what is called DC in supply chain management?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)