Please let me know DG set b check how many hour and days.
Answers were Sorted based on User's Feedback
Answer / hemanth kumar.b
300 HRS OR 6 Months which is earlier should do the b-check.
Is This Answer Correct ? | 3 Yes | 0 No |
How short circuit MVA(Fault MVA) in a power system calculated for calculating number of earth plates ?
if suplly 11kva its give 440volts then if suplly is given 10kva whats the volts given
How to make two bulbs glow Alternatively?
we have 3*1 MW generator one NGR is common for all it will be selected during paralle our problem is two generator ca be paralled but when slecting third one we need to close NGR selection on third one other wise voltage not matching why?
What is meaning of out of phase (making & breaking) capacity And how to calculate
what is meant by 2 within a star in a voltmeter dial?
In an ideal transformer no load primary current I0 A lags behind V1 by 90 degree B is in the phase with V1 C leads V1 by 90 degree D lags V1 by 45 degree
What is the Full form of Rccb,MCCB,
11 Answers Marriott, Maruti Suzuki, MCB, PCC, RCCB, Torrent Pharma,
explain the details about vaccum circut breaker and advantages?
HOW WORK HEAT PLATE EXCHANGER
Why we use Y-Y connection in power transformer (8-10 MVA, 132 kV to 11 KV)and D-y in distribution transformer (2 MVA, 11 KV to 440 Volts)?
Tell me all plants load factors i.e which plant operating on which load?