For Wet Mix Mecadam design what is Optimum moisture content
No Answer is Posted For this Question
Be the First to Post Answer
How do you determine specific gravity of cement?
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
how does I measure the unit weight of steel?
How to plan a project
0 Answers Ahluwalia Contracts, SDS,
What are advancements in civil engineering?
how can change 12mmdia@150c/c bar spacing to 16mmdia
12 Answers Amanah Tech, Envoy Group, Globus Constructions,
satart to end steps by step process of building construction...? i want to planning theme accuretly
Why is the statue of liberty made of copper?
Quality of first class bricks
Stander Size of Brick