How to calculate manhole brick work quantity.
Answer Posted / bhupendra
simple the manhole shape have circuler but longitudinally it shape have paraboliv .firs we find the circumference both ends and take everage .then multiply it with width & height.
| Is This Answer Correct ? | 30 Yes | 8 No |
Post New Answer View All Answers
Write short note on construction programme for pile foundation.
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
what is parametre for M25 after 7 days strength
Define What is rigging?
How can you distinguish between sorption, absorption and adsorption?
What is componsation
how gradation of aggregates effect on slump of fresh concrete?
What is the difference between a wood shake and wood shingles?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
how to check and keep control on the wastage of material at site
What are the steps involved in the concreting process?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
What is Refuse Area In High Rise Building ?