What is the difference in design between Working Stress method
& Limit State Method ? Briefly Explain.

Answer Posted / pintu dutta

Differences between Working stress method and Limit state method
Design of RCC Structures
The design of the components of the RCC structure can be done in the following two ways:
1.Working Stress Method
2.Limit State Method


Working Stress Method
*.The Stresses in an element is obtained from the working loads and compared with permissible stresses.
*.The method follows linear stress-strain behaviour of both the materials.
*.Modular ratio can be used to determine allowable stresses.
*.Material capabilities are under estimated tolarge extent. Factor of safety are used in working stress method.
*.The member is considered as working stress.
*.Ultimate load carrying capacity cannot be predicted accurately.
*.The main drawback of this method is that it results in an uneconomical section.
Limit State Method
*.The stresses are obtained from design loads and compared with design strength.
*.In this method, it follows linear strain relationship but not linear stress relationship (one of the major difference between the two methods of design).
*.The ultimate stresses of materials itself are used as allowable stresses.
*.The material capabilities are not under estimated as much as they are in working stress method. Partial safety factors are used in limit state method.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why the openings of sieves are square io size?

1105


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

1890


Define What is unit weight of normal concrete?

683


What is binding spacing of the rebars at lapping zones.

620


which red: used in roof teping, then use only cement

1569






The 4 main factors to start a construction project are––

1798


Write short note on construction programme for pile foundation.

4978


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1922


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1541


What is limit state method and working stress method and ultimate method

1142


how to calculate the scour depth

2359


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1956


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

676


give me the rate analysis for Bituminous Macadam and SDBC

6953


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1140