What is the stripping time of shuttering for PPC concrete
Answer Posted / sjtbehera
What is mean by stripping. If you ,mean deshuttrring, then it wii 14 days to keep
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the responsibilities of a construction manager?
what is cement wastage percentage in NHAI ROAD WORKS
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
what is the difference between replacement of cement by groundnut shell ash
how to tie 10 legged stirrups
What is meant by dimensioning?
What is absolute pressure? How absolute pressure is calculated?
trapozidal
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
RR masonry rate analysis
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
how to design and calculate materail quantity for concrete speedbreaker ?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand