we have earthmat at 110KV substation.we would like to take
earth resistance.b some says that by connecting earth megger
terminals (C1,P1) at middile point of earthmat (at riser)
will cause voltage gradient at other earthmat nods and dont
get exat earth resistance.when connecting at end nods will
get exat value . is it correct .please explain
No Answer is Posted For this Question
Be the First to Post Answer
I want to ask a question which i faced during testing of Capacitive Voltage Transformer in AIS. We have measured the C1 , C2 individually , but when we start to measure the total C1+C2 , the testing equipment shuts down and says low loading. Kindly is it possible to find the total capacitance by using measuring device. kindly briefly explain the procedure.
Is it possible we are step down 11 kv to 230v ?
in alternator how we can give power to rotor ? its power is AC or DC ?
please send me latest & previous years question papers for IOCL Technical level questions
How to test REF relay testing for LV panel as per Kahramaa standard?
Why, the starting current of 3 phase Induction Motor is 7 to 8 times its rated current?
why we use end termination kit for ht xlpe cables
what is difference between inductive and reactiveload?
What is sequence network? Discuss all three types of sequence network.
how much UPS neutral erath leakage current.
how to prepare PPM schudule
why the LED of my electrical meter glows even after the line has gone. what actually the reason?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)