Dear Sir / Madam,
Actually we requied 64 A MCB,
But i have 32 A MCB = 2 No's
this two i have to make series connection and we usw any
place?
isit possible or not......
Answers were Sorted based on User's Feedback
Answer / sagar
NO.
Because
MCB is used for over current protection.
you require 64A MCB for protection.
now if you will use 2 MCB of 32 A , then both the MCB will give protection for 32 A and will trip at 32 A.
so , you can't use the 32 A MCB in place of 64A MCB
| Is This Answer Correct ? | 21 Yes | 1 No |
Answer / hemant
if u connect 2 mcb's in series then it share load up to 32
amp only not for 64amp. if u used this two mcb then u must
to divided load in to two section like 32/32 amp. after
then u can connect load to out going terminals of mcbs.
| Is This Answer Correct ? | 14 Yes | 0 No |
you can do that, but in parallel. not in series
| Is This Answer Correct ? | 3 Yes | 0 No |
MCB USE ONLY LOW TENSON THIS RANGE 6AMP. TO 63 AMP.
VCB USE ONLY HIGH TENSON LINE FROM 2000AMP TO 4300 AMP.
| Is This Answer Correct ? | 0 Yes | 0 No |
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
what is speed of light?
1.what is the difference between transformer differential and busbar differential.2)why we are using 2 slope for trafo diif and 1 slope for busbar diff.3)what is the purpose of metrosil and stabilizing resistor in high impedance relay circuit.4)how metrosil reduce the peak volage.5)what is the funtion of stabilizing resistor
what is the working principle of tube light?
which of the following loss varies with the load a)hystresis loss b)eddy current loss c)copper loss d)core loss
how can we avoid magnetostriction in transformer?describe the suitable methods.
Why does the adjacent zone of protection overlap?
why Transformers power mentioned in KVA?. and why Generators and Motors power mentioned in KW?.
why grid failure happens?
how we decide the require size is this for a known current at fuu load?
i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls
can any one explain about when EB supply failed then how the load will transfer onto DG's step by step.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)