silt%= silt volume/
silt+sand volume
is this right?
No Answer is Posted For this Question
Be the First to Post Answer
What is the roll of face bars in beams
how much % of cement can be replaced by flyash ....
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
how to calculate for ramp slop?
What is the strength of 150x150mm cube compared to 300x300mm concrete cube?? Why?
why secondry beam rest on primary beam
1 Answers Exotica Housing Infrastructure,
How to correct a column which don't have sufficient cover?
Approximate weight of a modular brick?
procedure for preliminary selection of size of column of 5 storey building
what are the changes in concrete pour height as per IS 456, 2009?
What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
1 Answers AKM Construction Management,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)