HOw to derive reynolds equation?
Answer / shirish
reynold's number= inertial force/viscous force
= DV/u/p
=DVp/u
where D=diameter of pipe
V= velocity of water
p=density of water
u=viscosity
reynolds number derive by keeping vertical glass tube. The
tank filled with ink add in glass tube throught nozzle.
calculate flow rate.
if q<1000 laminar flow
1000<q<4000 transition region
q> 4000 turbulent.
| Is This Answer Correct ? | 4 Yes | 3 No |
how can i prepare for gate chemical in kolkata
The job profile as a Service Engineer?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.9 : In the modelling of the total of n rolls of a dice by an engineering student, let D be the random outcome of rolling a dice once. (a) Find the probability of outcome of D = 1, 2, 3, 4, 5 and 6. (b) Find the average score of each rolling of a dice D. (c) Find the expected value, Sn of n rolls of a dice in term of n and D. A new dice has a value of D* = D - 3.5. (d) Find the values of D* for each volume of D = 1, 2, 3, 4, 5 and 6. (e) Find the equivalent model of Sn in term of n and D. (f) Find the expected value of D*.
Question 36 - For a mixture of benzene (B), toluene (T) and xylene (X), the equation applies where x for B, T and X will sum up to 1. The equation of x for each component is x = (L / V + 1) (F) / (L / V + K). The data of F for each component are : 0.5 for B, 0.35 for T, 0.15 for X. The data of K for each component are : 1.98 for B, 0.76 for T, 0.24 for X. When x for B + x for T + x for X = 1, find the values of (a) L / V; (b) x for each component of B, T, X respectively. You may use Excel program - Data : What-If-Analysis for Goal Seek to perform the iterative calculations.
What factors go into designing the vapor space of kettle type reboiler?
ENVIRONMENTAL ENGINEERING - QUESTION 22.2 : Biochemical Oxygen Demand (BOD) could be calculated using the formula BOD = (DOi - DOf) (Vb / Vs) where Vb = Volume of bottle in ml, Vs = Volume of sample in ml, DOi = Initial dissolved oxygen in mg / L, DOf = Final dissolved oxygen in mg / L. (a) By using a bottle of Vb = 300 ml with sample Vs = 30 ml, find the BOD if DOi = 8.8 mg / L and DOf = 5.9 mg / L. (b) By using a bottle Vb = 600 mL with sample Vs = 100 mL, find the BOD if DOi = 8.8 mg / L and DOf = 4.2 mg / L. (c) Find the average BOD = [ Answer of (a) + Answer of (b) ] / 2. (d) If the BOD-5 test for (a) - (c) is run on a secondary effluent using a nitrification inhibitor, find the nitrogenous BOD (NBOD) = TBOD - CBOD. Let TBOD = 45 mg / L and CBOD = Answer of (c).
What type of heat exchangers are most commonly used for a large-scale plant-cooling loop using seawater as the utility?
BIOCHEMICAL ENGINEERING INSTRUMENTATION - EXAMPLE 29.5 : The following formula is used as a reference : (analyte signal) / (internal standard signal) = (f-factor) x (concentration of analyte) / (concentration of internal standard). A solution containing 3 mM of analyte and 4 mM of internal standard gave peak signals of 2 and 3 mamps respectively. Another similar solution containing 2 mM of analyte and 1 mM of internal standard gave peak signals of 1 and 4 mamps respectively. Find the average f-factor.
Any books are availble to read for industrial promotional officers exam.. Syllabus : PAPER-2 : Subject (Diploma Standard) Applied Science, Engineering and Management 1. MATHEMATICS 2. PHYSICS 3. CHEMISTRY 4. INDUSTRIAL MANAGEMENT 5. INDUSTRIAL ENGINEERING 6. COMPUTER APPLICATIONS & BASICS OF DOS, WINDOWS, UNIX, DB MANAGEMENT, DTP, CONCEPTS OF E-GOVERNANCE INCLUDING E-MAIL, E-COMMERCE, INTERNET, COMPUTER VIRUSES.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.
How can the particle size distribution be determined in a given bulk solid?
what is isochronus and droop speed?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)