Can we Co-ordinate relay in Load Break switch?



Can we Co-ordinate relay in Load Break switch?..

Answer / Deepika Kapoor

Yes, relays can be used to coordinate the operation of load break switches. The purpose is to control the sequence of opening and closing of the circuit breakers (or switches) for safe and controlled loading of a power system. This helps to avoid excessive current or voltage fluctuations during switching operations.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how many methods for starting an induction motor?

7 Answers   Hindustan Unilever Limited, Hyundai, TPL,


A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.

1 Answers   VECL,


what is the multi strand cable size? 0.45mm is area of one strand & 370nos of strand.

1 Answers  


What is the difference between MCCB & MOCB?

1 Answers  


why transformers not work at d.c.-

3 Answers  


Why cannot we insulate HT over head cable to avoid ionization of air around the HT Cable?..By this we can minimise corona loss also..

1 Answers  


what is difference between differential protection and distance protection and how we calculate the sloop?

5 Answers   OPS, Power Grid,


What is the difference between Rectifier & Converter?

12 Answers   Bajaj,


Describe the difference between a microcontroller and a general purpose computer.

2 Answers   Siemens,


What is surger vector in 33Kv transmission feeder? We have AC power generator of 8MW which is paralleled with 33Kv EB grid. Some times our HT breaker gets trip off due to surge vector problem. How to over come it? Is there any device to observe the surge and avoid tripping?

3 Answers  


what is interpose? where it is used and why it is used?

1 Answers  


can I connect step down transformer(25KvA,240V Phase to phase)to output of online UPS(15KvA,440V PHASE TO PHASE) Load connect to TRANSFORMER is 13KvA,240V PHASE TO PHASE. please brief if it is wrong

1 Answers   DRJ ARDE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)