Please tell me Detail cost of providing& laying nominal mix
design 1:2.5:5,40mm nominal size.curing complete e/c cost of
form work in foundation and plinth i/c carriage.
No Answer is Posted For this Question
Be the First to Post Answer
what"s the formula to find the cement,sand,aggreegate(45mm) requirement for PCC?
What is the main difference between crushing test and impact test in coarse aggregate?
limit value of bulking of sand
how to clculate the %of concrete strenght achive after curing?load
0 Answers L&T, RJ Construction,
age of tree determine by redius of its items circumference of its stem no. of branches no. of annual rings
600 brass equal to how many cubic meter..
what is the least count of auto level staff
what"s the formula find the cement consumption for brick work 12 thick wall 1 m2?
Did any of the egyptian pyramids ever fall down?
what means if slump is less than 25mm and greater than 80mm?
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?