. What three Specific Job Positions do you target from the
Company
Answer Posted / amit debnath
BEST THREE POST FROM THE TOP IN MY RESPECTIVE FIELD.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
can any one explain bar bending schedule of bems and columns and slabs ??
Define What glue is least sticky?
what is called Bulk Density of aggregate?
How will you reduce the concrete flow after mixing the concrete
Describe the sections included in a typical bill of quantities
what is the specific gravity of rubble in plum concert
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
How to find out kg per Sft ?
what would be the design load of R.C.C Cooling tower per cell.?
Explain major differences between routing maintenance and major maintenance.
In cement concrete how to check a quality of material also proportion of material at site ?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.