Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


who to calculate the bar bending schedule?

Answers were Sorted based on User's Feedback



who to calculate the bar bending schedule?..

Answer / srikanth

As per the Particular drawing the Structural Engineer as give the Steel Requirement & spacing of the Particular steel on that basis we can calculated of the Steel.

Is This Answer Correct ?    1 Yes 0 No

who to calculate the bar bending schedule?..

Answer / rajesh.d.v.s.p.

the length of bar will be depending up on the straight length of bar
+bend+hooks(Bend for every 45 degrees length of bar is 4 dia)

Is This Answer Correct ?    0 Yes 0 No

who to calculate the bar bending schedule?..

Answer / venkat

with help of existing formats

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

what is C50 expressed in kg/m3

2 Answers  


Mention different types of roof systems?

0 Answers  


what is spt

2 Answers   L&T,


Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR

1 Answers   NICE,


how many types of hydraulic coefficints and their values

2 Answers  


What are the different methods for drawing an arc?

0 Answers  


How to calculate sand,cement for 1:5ratio brick masonary

4 Answers   IVRCL, Jamek, Prera Nirman Sewa, SPCL,


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

0 Answers  


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

1 Answers  


What is Lean Concrete?

12 Answers   L&T,


Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft)

1 Answers   DLF,


What is Critical path in Ms-Project ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)