Answer Posted / srikanth
As per the Particular drawing the Structural Engineer as give the Steel Requirement & spacing of the Particular steel on that basis we can calculated of the Steel.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
How is the strength of cement measured?
How to find beam R/F cutting length
what is the method used for marking of cantilevers in hirise buildings by using theodolite
what else we can add rather than admixture in concrete to reduce the cement quantity?
How much percentage of brick bats allowed in CD-75 bricks
What is the maximum strength of cub compress strength in one cub testing
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
In jack arch floor, the rise is kept?
What are your future hopes for this job?
Trapezoidal section footing calculation of Volume & its Area
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Define What is diversion tunnel in a dam?
What is the use of array command?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght