In my project i am layout cables under the Maintainance bay
/Maintainance yard in the TG Building. Whether in this route
i can lay the H.T.Cables??? i am taking all H.T cables from
the H.T Transformer to the TG Building..
Answer / annonymous
Usually we dont lay any type of cables in the maintenance bay, but you can lay it, but make sure it does not physically interfere with the maintenance activities i.e. equipment handing etc. or block the access ways there.
Also, your client may also not permit you to do so.
Is This Answer Correct ? | 1 Yes | 0 No |
Why we choose 400kv,220kv,132kv,66kv,33kv transmission voltages for transmitting power. Why not other voltage levels.
21 Answers College School Exams Tests, HC, HCL, Jaypee, JPMorgan Chase,
How to check op amp using multimeter
is it possible to minimize the copper loss?
if the length, number of turns and area of coil are doubled then inductance of the coil becomes.?
what is LOS(line of sight)?
why vector group used in transformer and what effective in output
what is fault level in 66kV system?
For what purpose and why ACBs are used
what is the minimum clearance between a 11KV 150KVAR capacitor cell and series reactor.can a series reactor can be mounted in the same structure of the capacitor cells structure
What happens if i apply 500V to 440V rotary Switch ?
Hi Friends pls give information regarding BARC written test. am attending by 20-5-2008. mail me to kkumarei@gmail.com or message to 9962122264
electromechanical relay type identification example : type=tjmh t-stants for j- m- h-