which tie is used in binding of steel double tie or single
ti?
Answer Posted / ratheesh
Double binding is always good. if u want to reduce the
construction cost you can use single bind, but above 12 mm
rods should be done with double binding.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What is the tallest man made structure in the world?
What are the benefits of rcc pipes over steel designed pipes?
Define different types of roof systems?
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
why is the column design?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How we calculate the service time of buildings
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
What quantity of 1.0 m3 bricks required?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Why is the statue of liberty made of copper?