What out turn civil works
No Answer is Posted For this Question
Be the First to Post Answer
How do you find the weight of rod per metre lenth ?
Calculation of curtain wall of box culvert
wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .
Describe why concrete must be compacted after it is poured?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is the difference between linear dimension and aligned dimension?
Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
What are the tests on concrete?
What is all weather canal
Which is the most prominent tower of world?
what is the difference between compaction and consolidation?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)