I have used the proportion of cement:sand:gravel, is 1:2:4.
cement and the sand was provided by the company but i
provided the gravel. this combination was used to fill 500
cubic ft of wall. now i want to know how much gravel was
used in making the wall. can you guys please help me?
Answer Posted / bsjakhar
439.88 cft gravel is used
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is meant by engineering drawing?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
residential buildings,mixing of concrete,structural,construction material,site handling.
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
roll of DLC in road constructions
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
How much time Required for PPR pipe network testing
Sir how to find cutting length for footing steel bars in the shape of "u"
what are the values of compressieve strenght?
what is the productivity in aluminium shuttering per day
how much percent are used 20mm,10mm?
IS code for Rolling Margin of steel
what is raft foundation
How much quantity of cement,sand,stone used to build 1 cum of cc road??