I have used the proportion of cement:sand:gravel, is 1:2:4.
cement and the sand was provided by the company but i
provided the gravel. this combination was used to fill 500
cubic ft of wall. now i want to know how much gravel was
used in making the wall. can you guys please help me?
Answer Posted / bsjakhar
439.88 cft gravel is used
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to find quantity of concrete in PCC M15
I need to constructive work in amaraj batteries
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is the difference between engineering stress and true stress?
What is Heavy Concrete & Normal Concrete
how to find out hard strata in bored pile when the DMC method adopted.
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
what is differences between ferrock and concrete ?
What is proportion of PCC Grade G?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What is the name of this multiplication factors ?
What are the ingredients of pre-stressed concrete?
how to design and calculate materail quantity for concrete speedbreaker ?
What is absolute coordinates?