If the t/f capacity is 500KvA then what is Amps ratting of
the main breaker.

Answers were Sorted based on User's Feedback



If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / rekha.k.m.

It's 800A set at 665A

Is This Answer Correct ?    5 Yes 1 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / santosh k b

800 Amps( Rekha k m answer ok)

Is This Answer Correct ?    2 Yes 1 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / thiru arasu

the above one is right,.

Is This Answer Correct ?    0 Yes 0 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / athar abid

As we Know that

KVA = Sqrt 3 . Voltage(V) . Current(I)

Now for 400V (Phase-Phase) syayem

I = 500KVA/(1.732 * 400)
=500*1000/(1.732*400)
=721.7 Amps

There is no standard breaker available with this rating, so
take one step above rating i.e. 800Amps

Hope its clear.

Regards
Athar Abid

Is This Answer Correct ?    1 Yes 1 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / krishna reddy

2000Amps

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

Why the rating of the HT breakers are in 1250 Amp, while the load on the breaker is around 50 Amp. ?

9 Answers   Wipro,


if any leas acid battery is having low or high sp.gravity taen what will be effect of battery and why

4 Answers   CFCL,


What will hapen if we connect more capacitors than required for powerfactor control? Exactly what will be the effect on power system?

2 Answers   Mandovi Pellets,


What is tan delta point of transformer?

2 Answers  


How many types of probe used in cro?

0 Answers  






why we not using 230kv directly why we are stepping down and then stepping up

2 Answers   Siemens,


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

0 Answers  


how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me

0 Answers   ONGC,


IF I USED VVVF DRIVE IN FAN APPLICATION MOTOR IN 6.6 KV ( 700 KW) MOTOR & DURING NORMAL RUN OPERATION TIME IF RPM SUDDENLY REDUCE IN MOTOR BY DRIVE(E. MOTOR RPM REDUCE SUDENLY 687 TO 550 RPM) WAHT WILL BE HAPPEND IN DRIVE

1 Answers  


If a HV Underground Cable (13.8KV) is layed in the ground below 1.5 Mtrs and any building construction is done on the Cable route. IS this allowable or Not? What should be the clearance. As per ISO construction on HV cable route is safe or Not? Why? Can any body suggest the site for my question?

1 Answers   ZCL,


cleat wiring system is used at

2 Answers  


what do you mean by synchronous speed of a three phase induction motor?

5 Answers   FlexPoint,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)